HOOSAC TUNNEL FACTS First Proposed (for canal) ============ 1819 Chartered, ============================ 1848 Commenced, ============================ 1851 Headings met, ================ Nov, 27, 1873 Completed, ============================ 1875 Total Length, feet, ================= 25,081 East End to Central Shaft, feet, ==== 12,837 Central Shaft to West Shaft, feet,==== 9,694 West Shaft to West End, feet, ======== 2,500 Depth central Shaft, feet ============ 1,028 Depth West Shaft, feet, =============== 318 Size Central Shaft, feet, ============ 15x27 Size West shaft, feet, =============== 10x14 Height Eastern Summit, feet, ========= 1,429 Height Western Summit, feet, ========= 1,718 Grade per mile, =================== 26 -- 40 Error in line at point of meeting,== 9/16 In. Rock: Mica Slate with Quartz Nodules Water pumped from C.S., gal. per min. == 214 Rock excavated, tons, ============ 1,900,000 Height, feet, =========================== 20 Width, feet, ============================ 34 Water discharged East End, gal. per min. 100 Water discharged West End, gal. per min. 600 Men employed, =================== 800 to 900 Miles from Boston, ===================== 136 First Train through, ========== Feb. 9, 1875 First Freight, =============== April 5, 1875 First Passenger, ============= Oct. 13, 1875 Above Tide at East Portal, feet, ======= 766 Total Length of brick arching, feet, = 7,573 Number of bricks used in arching, 20,000,000 Cost, ========================== $14,000,000 Lives Lost, ============================ 195 Contractors, F. & W. Shanley, Montreal. Chief Civil Engineer, Benjamin D. Frost. Explosive, Tri-nitro Glycerine. One pound of Glycerine equals 13 pounds of powder.