Held honestly: test runs and service are separate ladders.
Data plate — the record table
| Holder | Class | km/h | Year | Note |
|---|---|---|---|---|
| JR-Maglev L0 | TEST RUN | 603 | 2015 | Guideway, not rail. Own category. |
| SNCF V150 | TEST RUN | 574.8 | 2007 | Wheel on rail. Modified set, raised voltage. |
| Shanghai Transrapid | SERVICE | 431 | — | Peak on a short airport run. |
| CR Fuxing | SERVICE | 350 | — | Beijing–Shanghai. The fastest thing you can buy a seat on. |
| TGV · Shinkansen E5 | SERVICE | 320 | — | The European and Japanese working ceiling. |
| Tōkaidō Shinkansen | SERVICE | 210 | 1964 | At opening. The line that reset expectations. |
| Mallard | TEST RUN | 202.8 | 1938 | Steam. Downhill, and never bettered. |
A record set once on a prepared corridor and a speed a railway sustains every day are different achievements. Sorting the table does not merge them.
In this section

The headline numbers still rise. The working timetable has not moved in twenty years.

Prepared track, raised voltage, larger wheels, a shortened set — and everyone standing well back.

Guideway, not rail. Why comparing them on one ladder is a mistake.